Saturday 20 October 2012

Design Practice:: Direction Change

In my progress tutorial Phil suggested that I work on my RSA Change Makers brief for 2 weeks just so that I have got one brief behind me and completed. I wasn't sure about this as I felt I was making good progress with my Tee brief, having worked on it for 2 weeks and having 2 weeks left to work on it. However, at the end of last week I did begin to become disengaged with my design work, I felt a little stuck and therefore was not working to the standard I should be, nor putting in the hours I should. Therefore, I have decided that working on the RSA brief for 2 weeks, then revisiting the Tee brief for 2 weeks after this would be a good option; it will allow me to work on fresh designs and keep me interested. Plan.